CONSTRUCTED IN 3 PHASES. 2010 THE ROOF OVER ALL FIRST LEVEL & PORCHES REPLACED. RESCREENED THE PORCHES & ADDED 2 CEILING FANS, PAINTED 368 BANISTER RAILS. ADDED INSULATION IN HOUSE & REFINISHED ALOT OF THE HARDWOOD FLOORS. 1993 VINYL SIDING WAS ADDED TO EXTERIOR AND 2000 THE COLUMNS WERE REPLACED. 2006 DRAIN LINES CHANGED FROM CAST IRON TO PVC & 2007 SEPTIC DRAIN LINES REPLACED.
This property is not currently displayed as for sale or rent on Zillow. This may be different from what's on other websites or public sources.