Total gut done 2019. 2018–roof, gutters, soffit, facia, water heater. 2019-insulation, drywall, flooring throughout, doors, trim work, ceiling fans, light fixtures, electrical, some plumbing; kitchen cabinets, apron sink, appliances, Cambria quartz perimeter, backsplash, island; bathroom shower, toilet, vanity, heated floor; surround sound system, Blink security system, partial B-Dry drain system coming at beginning of May! Working on Master bedroom at the moment then closet/bath. More than what I can list…but also continuing to work on it as we live there…so more to come as long as we still own the home!
This property is not currently displayed as for sale or rent on Zillow. This may be different from what's on other websites or public sources.

