2008: Installed multiple built-in shelving units (overhead and along side walls) and pegboard paneling with hooks for storage in Garage. 2010-Built-in closet, multiple shelving and dresser drawers installed in Master Bedroom Walk-In Closet. 2016-Built-in closet, multiple shelving and dresser drawers installed in Bonus Room Walk-In Closet. 2017-Completely replaced all three exterior side walls of Masonite Siding with "James Hardie Hardieplank Color Plus Fiber Cement Siding, HardieBackerboard, HardiePanel, Hardieboard Pre-cut Panels, HardieTrim and HardieFascia." 2018-Completely replaced all downstairs flooring (solid hardwood floors installed in the Family Room, Foyer, Formal Dining Room, Butler's Pantry, Coat Closet and Office (previously Formal Living Room). Installation of 20" x 20" ceramic tiles in the Kitchen, Walk-In Pantry and Laundry Room; Installation of 12" x 12" ceramic tile in the Powder Room. Replaced all Kitchen appliances with Stainless Steel appliances (Stove, Refrigerator, Dishwasher and Microwave). 2019-Every room painted with Behr Marquee Paint, both upstairs and downstairs interior walls, doors and trims (inclusive of wainscoting, window sills and door jambs). 2020-Front Door (plus all hardware), Back Double Door (plus all hardware), and French Double Doors to Office replaced; built-in indented casing with beveled glass shelving installed on each side of French Double Doors in Foyer. 2021-Exterior front wooden stair railing to front door entry of home completely replaced with Marine plywood and painted white. Wooden Cabinet with 4 glass doors & underneath recessed lighting installed over small countertop with bar-sink in the Butler's Pantry.
This property is not currently displayed as for sale or rent on Zillow. This may be different from what's on other websites or public sources.