Fixer upper in process of being fixed up. New shingle roof installed 4/24/22. Aged swamp cooler detached and recycled 4/30/22. New cooling systems being explored. New S.S. sink installed in kitchen (black composite sink can not be sterilized for safe food handling). New gas stove installed 5/05/22. Room painting ongoing. New garage door and WIFI garage door opener installed 3/31/22 Landscaping going thru total overhaul for xeroscaping.
This property is not currently displayed as for sale or rent on Zillow. This may be different from what's on other websites or public sources.
