New A/C/Heating unit installed August 2015. New vinyl flooring installed downstairs 2020. New baseboards and custom doorway trimwork downstairs. Double pocket doors with glass panes installed in sunroom to living room 2012. Living room wood paneling removed and sheetrocked, and popcorn ceiling scraped and textured throughout entire downstairs area. Upstairs remodeled with stained hardwood floors throughout, stairs replaced, fresh paint, ceilings scraped and textured, new ceiling fans and door hardware. New trimwork as well. Upstairs bath new toilet, fresh paint and hardware, new vinyl floor, all 2015.
This property is not currently displayed as for sale or rent on Zillow. This may be different from what's on other websites or public sources.

