Plantings +/-26 net acres are planted to Lisbon Lemons on Carrizo rootstock. Trees were planted in 2019. Water Property is located in Alta Irrigation District and part of Kings River East GSA. The property receives 100% allocation from Alta ID. There is one (1) 280′ ft. Ag well (12″ casing), with a 20 HP 5-stage submersible pump, installed in 2019. There is also a 15 HP booster pump. Trees are irrigated via a fan jet and drip line system. Soil The property has Centerville clay, Exeter loam, and Hanford sandy loam soils. Wind Machines There are three (3) V10 propane powered Amarillo Wind Machines, with auto-start Altrac in the grove. Legal Tulare County APN: 021-020-030 Groundwater Disclosure Sustainable Groundwater Management Act (SGMA) requires groundwater basins to be sustainable by 2040. SGMA requires a Groundwater Sustainability Plan (GSP) by 2020. Said plans may limit ground water pumping. For more information please visit the SGMA website at https://water.ca.gov/programs/groundwater-management/sgma-groundwater-management.
Explore the cost of this home by adjusting the details. Changes won't be saved.
Principal & interest
$1,547
Mortgage insurance
$0
Property taxes
$170
Home insurance
$105
HOA fees
$0
Utilities
Not included
All calculations are estimates and provided by Zillow, Inc. for informational purposes only. Actual amounts may vary.
HOA fees may include property taxes on listings classified as Co-Ops. Contact the listing agent and/or owner for fee details.
Mortgage interest rates are dependent on a number of factors, including credit score, down payment, and repayment length. Interest rate data provided by Zillow Group Marketplace, Inc. as of 1/1/1970 from various mortgage lenders with which we have lead or other similar arrangements; the Estimated Payment is an average of those rates.
See how much you could borrow to make a competitive offer.